Back to Help Center
guideschedulingPinned

How do I mark a job as complete?

When the job is done, slide the green 'Slide to Complete Job' bar at the bottom of the screen. That locks in your earnings and starts the customer rating request.

Updated Apr 17, 2026
8 views

Slide the green button at the bottom of the screen — that's it.

Once you've started a job and finished the clean, the bottom action bar shows a Slide to Complete Job bar.

How to complete:

  • Make sure all interactive checklist items are ticked (tick them as you go)

  • Take your before/after photos if the job calls for them — customers love them and they protect your Quality Control score

  • Slide the green button all the way to the right

  • You'll see a confirmation toast with the job duration in minutes

What happens next:

  • The job moves from In Progress → Completed

  • Your earnings for this job are locked in and added to the current week's pay run

  • The customer is asked to leave a rating (which feeds your Satisfaction score — 35% of your composite)

  • You're free to head to your next job

Why the slide (and not a button)?

  • Prevents accidental taps — you can't slide by mistake if your phone is in your pocket

  • Gives you one final chance to double-check you're really done before the timer stops

Before you slide, double-check:

  • Every checklist item is ticked

  • Photos are uploaded (if required)

  • You've done a final walk-through with the customer if they're home

  • Rubbish and your equipment are out of the property

The slide is the last step — once it's done, the job is locked in and payment is on its way.

completefinishswipeslidejobhow-toearnings

Was this article helpful?